Cycle Repairing and Adjusting
With a Chapter on building a Bicycle from a Set of Parts

År: 1916

Forlag: Cassell and Company, LTD

Sted: London, New York, Toronto and Melbourne

Sider: 152

UDK: 629.118

Emne: Reprint 1916.

With 79 Illustrations

Søgning i bogen

Den bedste måde at søge i bogen er ved at downloade PDF'en og søge i den.

Derved får du fremhævet ordene visuelt direkte på billedet af siden.

Download PDF

Digitaliseret bog

Bogens tekst er maskinlæst, så der kan være en del fejl og mangler.

Side af 168 Forrige Næste
ii6 CYCLE REPAIRING ment of the lock nuts (76 and 77) enables the hub to be sent out by the makers correctly adjusted. The makers recommend that the hub be kept clean and washed 76a 76 77 78 Fig. 53.—Parts of “Torpedo Coaster Hub out from time to time with * petrol ; for this purpose the wheel should be laid on the ground, step side downwards and petrol injected through the lubricator in the hub shell, after which the hub must be thoroughly lubri- cated. In order that the lubricating oil may run into all parts of the hub, it is also advisable to inject a cer- tain quantity of oil between the driving sleeve (88) and axle (91), and this is best done while the machine is still