Concrete Roads
and Their Construction

År: 1920

Serie: Concrete Series

Forlag: Concrete Publications Limited

Sted: London

Sider: 197

UDK: 625.8 Con-gl.

Being a Description of the concrete Roads in the United Kingdom, together with a Summary of the Experience in this Form of Construction gained in Australia, Canada, New Zealand and the United States of America.

Søgning i bogen

Den bedste måde at søge i bogen er ved at downloade PDF'en og søge i den.

Derved får du fremhævet ordene visuelt direkte på billedet af siden.

Download PDF

Digitaliseret bog

Bogens tekst er maskinlæst, så der kan være en del fejl og mangler.

Side af 256 Forrige Næste
IN THE UNITED KINGDOM—PROVINCIAL 51 carry any traffic which is likely to be brought upon it. Up to the present, the surface has the same appearance as when first opened. Cost.—As regards the cost, this has been rather high. The cost of labour and also the amount of material used are given, as it may be some guide to those contemplating this mode of construction. Cost of removing existing macadam roadway and preparing for concrete. Length, 300 ft. ; average width, 24 ft., equals 800 sq. yds. ; average depth. 6 in. :— Labour ...... £ . . 56 8. 10 d. 9 Horse hire ..... . 35 8 5 Roller (scarifying and rolling) 8 15 0 Watching and lighting .... . 13 10 0 Supervision (say) ..... . . 5 0 0 Total . £119 4 o This works out at 3s. per super, yard for preparing only. There were 206 loads of ussful material removed from the road and 300 ft. run of 12-in. by 5-in. stone channelling—for which a credit of £71 10-s. is placed to the job. Cost of reinforced concrete work :—- £ 8. d. Horse hire ....... . 47 8 0 Labour ....... . 154 2 3 Watching, lighting and fuel . 34 5 0 2-in. stone (73 tons 10 cwt. 3 qr. at 12s.) . • *44 2 4 1-in. stone (69 tons 2 cwt. 2 qr. at 12s. 3d.) . 41 9 6 Gravel and sand (86 tons 5 cwt. 1 qr. at 12«.) . . 51 15 2 Cement (42 tons 14 cwt. 1 qr. at 74s. 9rf.) . 159 11 0 Use of timber for staging, etc. . 25 3 6 B.R.C. fabric ...... . 108 8 9 Incidentals ....... 1 16 0 Tar 2 2 4 Supervision (say) ...... 5 0 0 Total .£675 3 10 For the 800 sq. yds. 6 in. thick laid this gives a cost per super, yard of nearly 16s, 11<7.