ForsideBøgerModern Gasworks Practice

Modern Gasworks Practice

Forfatter: Alwyne Meade

År: 1921

Forlag: Benn Brothers

Sted: London

Udgave: 2

Sider: 815

UDK: 662.764 Mea

Second Edition, Entirely Rewritten And Greatly Enlarged

Søgning i bogen

Den bedste måde at søge i bogen er ved at downloade PDF'en og søge i den.

Derved får du fremhævet ordene visuelt direkte på billedet af siden.

Download PDF

Digitaliseret bog

Bogens tekst er maskinlæst, så der kan være en del fejl og mangler.

Side af 880 Forrige Næste
THE MECHANICAL HANDLING OF MATERIALS 831 speed of 400 feet to 750 feet a mi nute may be attained. This is 10 to 20 times thc speed of the ordinary coke conveyor. The most satisfactory arrangement of the track is to suspend it from overhead steel lattice girders, having spåns of from 60 feet to 100 feet, supported at the end by steel tresties. This arrangement gives fewest obstructions in the yard, and fewer tresties to Fia. 244.— Junction Line Ofen. Fig. 245.—Main Line Opbn. suffer from the corrosive action of the coke mass surrounding them. Where, however, uprights are likely to be buried in coke they should be concreted up. The telpher collects its current from an overhead trolly-wire attached to insulators fixed above the track. A single wire is quite suitable where direct current generated at the works