ForsideBøgerThe Westinghouse Friction Draft Gear

The Westinghouse Friction Draft Gear

År: 1900

Forlag: Barlett & Company, The Orr Press

Sted: New York

Sider: 28

UDK: 625.201 Jern

Built by The Westinghouse Air Brake Co., Pittsburgh, Pensylvania, U.S.A.

Søgning i bogen

Den bedste måde at søge i bogen er ved at downloade PDF'en og søge i den.

Derved får du fremhævet ordene visuelt direkte på billedet af siden.

Download PDF

Digitaliseret bog

Bogens tekst er maskinlæst, så der kan være en del fejl og mangler.

Side af 36 Forrige Næste
; Westinghouse Friction Draft Gear Operation of Apparatus on a 45-car Coke Train in Daily Use for Four Years N1" EARLY all of the important experiments in the development of the Friction Draft Gear have been made upon this train, which is drawn by two engines and has been in daily service for four years. Since the substitution of yokes for tail bolts there have been no breakages of the Friction Draft Gear, notwithstanding the factzthat it has made double the mile- age of other trains fitted with ordinary draft gear in similar service. In the operation of this train between the coke regions and the point of delivery^it is necessary to weigh each car, and this is accomplished in the following manner, viz : The engine is detached from the train and run from 100 to 200 feet beyond the weigh scale. The cars are then separately detached, weighed 17