Engineering Wonders of the World
Volume III
Forfatter: Archibald Williams
År: 1945
Serie: Engineering Wonders of the World
Forlag: Thomas Nelson and Sons
Sted: London, Edinburgh, Dublin and New York
Sider: 407
UDK: 600 eng- gl
With 424 Illustrations, Maps, and Diagrams
Søgning i bogen
Den bedste måde at søge i bogen er ved at downloade PDF'en og søge i den.
Derved får du fremhævet ordene visuelt direkte på billedet af siden.
Digitaliseret bog
Bogens tekst er maskinlæst, så der kan være en del fejl og mangler.
TWO REMARKABLE ALPINE MOUNTAIN RAILWAYS. 305
jury. Among
the passengers
was our pres-
ent King, who
wrote of the
line that it
seemed to be
the safest that
he had ever
travelled
upon.
Naturally, at
such an eleva-
vented the tunnel scheme maturing. Had the
summit line become a permanent one (which
could have been done at a further cost of
about £500,000), and improved in the matter
of widening the gauge, reducing curves, using
more powerful locomotives, and modernizing
the working, there is little doubt that the
summit line would have been capable of
maintaining as good and efficient a means
of communication as is afforded by the
existing tunnel. The cost of working the
line would naturally have been greater, but
if this cost were capitalized, the total
REPRODUCTION OF A COMIC
SKETCH ISSUED WHILE THE
FELL RAILWAY WAS IN OPERA-
TION.
Underneath are the words, “ The
Fell Railway (train) arrives at the
summit of the Mont Cenis without
spilling any of its passengers.”
tion provision had to be made
against interruption by snow,
and this was effected by means
of covered ways of wood and
corrugated iron, or, where there
was danger of avalanches, by
artificial masonry tunnels built
against the side of the moun-
tain. Altogether the line was
thus protected for a distance of
about nine miles.
The line ceased running, in
accordance with a stipulation
in the concessions, when the
great tunnel was
Economy of , . «
the System. °Pened m SeP’
tember 1871 ;
but not until it had so fully
justified itself as to make many
people in Italy think that, had
Fell’s system been developed
sooner, it would, on account
of its far smaller constructional
and working costs, have pre-
(1,408)
VIEW OF THE MÖNCH FROM THE ENTRANCE OF THE SHORT TUNNEL
BETWEEN SCHEIDEGG AND EIGERGLETSCHER STATION, JUNGFRAU
RAILWAY.
20
VOL. III.