Engineering Wonders of the World
Volume I
Forfatter: Archibald Williams
År: 1945
Serie: Engineering Wonders of the World
Forlag: Thomas Nelson and Sons
Sted: London, Edinburgh, Dublin and New York
Sider: 456
UDK: 600 eng - gl.
Volume I with 520 Illustrations, Maps and Diagrams
Søgning i bogen
Den bedste måde at søge i bogen er ved at downloade PDF'en og søge i den.
Derved får du fremhævet ordene visuelt direkte på billedet af siden.
Digitaliseret bog
Bogens tekst er maskinlæst, så der kan være en del fejl og mangler.
THE MANCHESTER SHIP CANAL.
157
those who had brought the
canal into existence.
At Barton, Mr. Brindley
suggested that the new
waterway should be carried
over the river Irwell by
means of an aqueduct.
Parliamentary Committees
looked upon this proposal
as novel, and some of those
who considered the
were afraid it would
impossible
leakage of
aqueduct.
But the
to prevent
water from
Bill
be
the
the
illiterate engi-
neer requested
dredweight of
MR. J. K. BYTHELL,
Chairman of the M.S.C.Co.
(Photo, Lafayette.)
MR. W. HENRY HUNTER,
Chief Engineer.
(Photo, Lafayette.)
A Practical
Demon-
stration.
that a hun-
clay should
be sent into
the Commit-
tee Room,
so that he
might demonstrate the ab-
sence of any ground for
uneasiness on this score.
There and then he modelled
a short section intended to
represent the canal, and of
the water which he poured
inside not a drop had dis-
appeared when the Com-
mittee reassembled on the
following day. The experi-
ment was convincing, and
Parliament gave the duke
all the powers he requested.
The main contract for the
Ship Canal was entrusted
MR. E. LATIMER,
General Superintendent.
(Photo, Arthur Reston.)
MR. HERBERT M. GIBSON,
Chief Traffic Superintendent.
(Photo, Lafayette.)
Ship
Canal
Main
Contract.
to Mr. T. A. Walker, the con-
tractor who had driven the
Severn Tunnel, for £5,750,000,
and on November 11, 1887, the
first sods were cut at Eastham.
To expedite construction, the work was di-
vided into nine sections, each having its own
staff of resident and contractor’s engineers.
Two years afterwards, when all the sections
were in hand, Mr. Walker died; and as
his executors were unable to complete the
contract, the Ship Canal Company resolved
to undertake the task themselves. By this
time it was manifest, however, that the