CONCRETING UP. 49 one frame at a time as the concrete is brought up. In the King Edward Bridge caissons the first 26 ft. from the cutting edge was strutted with Steel girclers which were concreted in ; the timber framing starteel above this level. Below low water the timbers will be kept in position by the pressure of the water on the outsicle of the caisson, but above low water there will be a tendency for the shell to open a little. It will therefore be necessary to have a few light Steel girclers to tie the sides of the caissons together and prevent the sides from spreading. i)