K et 12 OUR ROADWAYS. i their bases, a groove is cut, which is filled with an asphaltic mastic (pitch and tar), during the process of laying. The blocks are laid on a concrete foundation, the angle of each course being in an opposite direc- tion to the previous one. The remainder of the LIGNO-MINEItAL WOOD PAVEMENT. joints to the surface are filled in with a grouting of lime and gravel. Carey's Wood Pavement is perhaps that which can be most rapidly laid down and repaired, and is formed as follows, viz.: the blocks are cut 4 in. wide by 9 in. long and to the depth of 5 in. or 6 in. accord- ing to traffic; these blocks are shaped with alternate convex and concave ends, and are laid on a bed of ballast or sand, averaging 2 in.; the joints which have been left about J in. wide, are filled with a grout of lime and sand. The advantages claimed for this pavement are, that by the peculiar shaping