History of the Typewriter
Forfatter: Geo. Carl Mares
År: 1909
Forlag: Guilbert Pitman
Sted: London
Sider: 318
Søgning i bogen
Den bedste måde at søge i bogen er ved at downloade PDF'en og søge i den.
Derved får du fremhævet ordene visuelt direkte på billedet af siden.
Digitaliseret bog
Bogens tekst er maskinlæst, så der kan være en del fejl og mangler.
— 88 —
The platen can be lifted out of the machine by merely
raising a couple of catches. It is thus quite easy to clean
the machine, or the type, without fear of having a heavy
carriage falling on one’s fingers.
Improved paper guides are provided which grip the
paper firmly as it passes through the machine, and which
can also be adjusted so as to hold any width of paper,
from an inch wide upwards. The paper needs only to
be placed on the paper shelf, and the platen revolved.
There is no need to lift the platen or the carriage in order
to pass it under the centre guide.
^The carriage band, or “ strap ” is of steel, and indeed,
steel seems to be practically the only thing, save the
key tops of the platen, employed in the making of the
Smith Premier.
As an example of Smith Premier methods, the following
incident is worth recording. The Company decided to
build a new factory. On the 2nd March, 1903, a site
was found. On the 3rd March workmen commenced to
dig the foundations.
The president of the Company determined that the
factory should be ready in four months. The architects
demurred, saying that the finished drawings would take
almost as long. “ Very well, then,” said Mr. President,
“ very well, then, we’ll do without the finished drawings.”
And so they went to work. They started building in one
place, before they had even decided what the length of
the building was to be. It was a neck and neck race
between the architect and the builder, and the architect
just managed to keep one floor ahead of the builder all
the time. And the difficulty of building the factory will
be all the more clearly understood when we say that it
was necessary, in order to bring the material to the place,
not only to build a branch railway, but also to build a
bridge across the adjacent creek. Four million bricks
were put into that building, 2,200 tons of stone, 250 tons
of iron, and over a million feet of “ lumber.” And so
the factory was built, and a thousand hands set to work
to make the Smith Premier.
The Duplex.
In the desire to obtain the highest possible speed from
the typewriter, a great many expedients have been adopted,
such as “ Speed Escapements,” “ Automatic Terminal
Spacing,” etc. The Duplex, however, sought to provide
a means of doubling the output of the operator by pro-