The Works Of Messrs. Schneider And Co.
Forfatter: James Dredge
År: 1900
Forlag: Printed at the Bedford Press
Sted: London
Sider: 747
UDK: St.f. 061.5(44)Sch
Partly Reproduced From "Engineering"
Søgning i bogen
Den bedste måde at søge i bogen er ved at downloade PDF'en og søge i den.
Derved får du fremhævet ordene visuelt direkte på billedet af siden.
Digitaliseret bog
Bogens tekst er maskinlæst, så der kan være en del fejl og mangler.
358 INDEX.
Station, the Central Lighting, 117
,, Railway, Buildings Constructed, 125
Stationary Engine Shops, Construction Department, 100
,, Engines, Construction Department, 108
Steam Boilers at Rolling-Mills, 78, 79
, , Oranes Built in Construction Department, 114
> , ,, of 100-Ton Steam Hammer, 58
, , Draining Pumps, Construction Department, 111
, , Engine, Tyre Shops, 53
, , Engines Replacing Water Power at Creusot, 2
,, Hammer of 1840, 4, 58
,> ,, the 100-Ton, 4, 57
, , Hammers for Balls and Blooms, Rotai'v Puddling Furnaces, 43
, ! ,, Built in Construction Department, 114
,, Small and Furnaces, Armour-Plate Shop, 59
,> ,, Tyre Shops, 52
,, Pipes, Covering for, 30
Steamer Engines, River, Construction Department, 101
Steel, Acid, its Uses, 42
, , Armour-Piercers, 326
, , Armour-Plates, the First, 4
> > ,, Messrs. Schneider First to Manufacture, 73
> > ,, Tonnage Manufacturée! by Messrs. Schneider,
76
,, ,, Trials, 75
,, Basic, its Uses, 42
,, Bessemer, Applications of, 33
,, ,, Qualities of, 33
,, ,, Testing, 33
,> ,, its Uses, 42
,, and Bronze Guns, Manufacturée! by Messrs. Schneider in 1870,
163
,, Cast in Steel F oundry, 49
,, Castings, Breaking Strain, 51
,, ,, Elongation, 51
,, ,, Manufacture of, 48
,, ,, Recently Manufacturée!, List of, 51
,, Tensile Strain, 51
,, ,, Tests of, 51
,, Compressing Plant for Liquid, 39
,, Forgings, First Manufacture at Creusot, 4
„ Foundry, 5, 48
,, ,, Capacity of Furnaces, 48
,, ,, Casting Pit, 49
,, ,, Composition, Tests and Uses of Steel Castings, 51
;, ,, Drying Booms, 49
,, ,, Examples of Castings Manufacturée!, 51
,, ,, Loarn and Sand Preparing Shop, 49
,, ,, Machine Tools, 50
,, ,, Pneumatic Hammers, 51
,, ,, Stoves for Annealing Castings, 51
,, ,, Tests of Steel Castings, 51
,, î, Travelling Crâne, Dimensions of, 49
,, ,, Varions Transformations of the, 48
,, Furnaces, Siemens-Martin, 34
,, for Gun Construction, Experiments of Messrs. Schneider on, 163
,, Guns, Manufactured by Messrs. Schneider, Early, 164
n >, Material used in the Manufacture of, 42
,, for Guns, Schneider Metal, 192
„ of Highest Qualities, for Gun Construction, 164
,, Industry at Creusot, Introduction of, 1867, 4
,, Ingot, the 120-Ton, 34, 57
„ Ingots Cast in Steel Foundry, Their Uses, 49
,> ,, Compressed, Dimensions of, 40
«> ,! ,, Method of Casting, 40
,, „ Exhibited by Messrs. Schneider, Paris Exhibition, 340
„ and Iron Plates Produced Annually at Creusot, 6
» ,, Rails Rolied at Creusot, 81
,, Ordnance, Construction of, at Creusot, 5
,, Process, Bessemer, Slag from the, 33
,, ,, Siemens-Martin, 34
,, Rail Manufacture at Creusot, 1867, 4
„ Shell, 326
Steel, Siemens-Martin, Annual Output of, 43
> , ,, Casting Pits, 34, 37
, ! » Material used for Manufacture of, 42
, , ,, Strength of, 42
> Supersedes Iron in Rolling-Mills, 78
, , Tyre Shops, 52
, , Tyres, First Manufacture of, at Creusot, 4
, , Used in Manufacture of Steel Castings, 48
, , Works, Bessemer and Siemens-Martin Processes, 31
! , ,, Fitting Shop, 31
, , ,, General Arrangement of, 31
> , ,, Heavy Forging Shop, 31
, , ,, Special Casting Shop, 31
, , ,, Tempering Shop, 31
, , ,, Tyre Shops, 31
Stevens, of Hoboken, 73
Storage of Water at Rolling-Mills, 79
Store of Bars, Rolling-Mills, 82
,, Rolis, Rolling-Mills, 82
Stoves for Annealing Castings, Steel Foundry, 51
,, Drying, Electric Construction Department, 115
Strength of Steel, Siemens-Martin, Mauufactured, 42
S truggie between Armour and Gun, 73, 74
Subsidies, Charitable, at Creusot, 9
Subventions, Paid by Messrs. Schneider, on behalf of their Men, (5
Supsrannuated orkmen, at Creusot, Special Benofits for, 9
Swing Bridges at Cherbourg and Brest, 12ö
System, the Railway, of Creusot, 6
Table of Analyses of First Compressed Steel Ingot Made, 41
Tank for Gun Tempering, 67
Tanks for Hardening Armour-Plates, 66
Tapping and Drilling Armour-Plates, 71
Telescopic Recoil Cylinders on Field Gun Caniages, 289
Tempering Plant, Armour Plate Shop, 57, 62, 65
,, Electric Travellers of, 67,
,, „for Guns, 67
,, Shop, the Steel Works, 31
Tenders for Locomotives Built at Chaloii Works, 125
Tensile Strain of Siemens-Martin Steel Manufactured, 42
,, >; Steel Castings, 51
,, Strength of Tyre Steel, 55
Terni Co., Foundation of, 74
“ Terrible ” Armour, Order given Messrs. Schneider, 74
Testing Bessemer Steel, 33
„ Ground at Creusot, the Villedieu, 5, 174
,, ,> Harfleur, 174, 177
,, ,, Havre, the Hoc, 5, 174
,, Laboratory, Rolling Mills, 82
,, Tyres, 55, 56
Tests, Composition and Uses of Steel Castings, 51
,, of Steel Armour-Plates Manufactured by Messrs. Schneider, 75
,, of Steel Castings, 61
,, of Tyres, 55, 56
„ of Work Done, Electric Construction Department, 116
Thirty-Five ton Furnace, Dimensions of Siemens-Martin, 3f>
Three-Motion Breeeh-Mechanisms, 194
Thi'ee-Phase Alternators Built, 121
,, Motors Built, 120
,, Transformers Built, 121
“ Three-Saints ” Armour, 75
Thitile Locomotive Built and Exhibited at Messrs. Schneidens Pavillon
336
Thury System, Messrs. Schneider Concessionaires for France, 118
Time-Firing Fuses, 324
Tonnage of Steel Armour-Plates Manufactured by Messrs. Schneider
76
Tools at Havre Gun Factory, 172
,, Machine, Steel Foundry, 50
Tool-making Shop, Construction Department, 100
“ Tordenskjold ” Armour-Plate Order, 74
Torpedo-Boat Construction, 126, 156