Motion Study
A Method for Increasing the Efficiency of the Workman
Forfatter: Frank B. Gilbreth
År: 1911
Forlag: D. Van Nostrand Company
Sted: New York
Sider: 116
UDK: 658.54 Gil Gl.
DOI: 10.48563/dtu-0000026
With an Introduction by Robert Thurston Kent Editor of "Industrial Engineering".
Søgning i bogen
Den bedste måde at søge i bogen er ved at downloade PDF'en og søge i den.
Derved får du fremhævet ordene visuelt direkte på billedet af siden.
Digitaliseret bog
Bogens tekst er maskinlæst, så der kan være en del fejl og mangler.
PAST, PRESENT, AND FUTURE OF MOTION STUDY IOQ
'-side and
a uuit.
IP tenders
cleats up
handle t
For the least displacement when jacking up scadbld. the ends of a
in a straight line with this face of this
, run is too springy, nail
against undo ■■
ie 3 plank« a<
.Use no plunks less than 10wide nor^
more than 12"wide on tender's platform
This spa e for brick
must be the same
lenght as the other
brick’sjiace of the
IM
Mako all holes 1J4" diameter. Use
To keep bricks out of masons way,
face brick must be stored here
while masons are laying filling
brick and vice versa
Use no plank less than 2,z thick on
any of the three platforms of this scaffold
Noj center plank is
needed here as the
hole is covered by
this mortar l?ox
i !
Thisjmortarlboxjinust
be nalf-wav’ between
the mortar box at the
left and the up|
at tie righ| 1
for buck
he same
the other
This space
must be
lenght.as .... .---
brick space oi the
Lay centerplank hard
acrninat. this uorieh 1
against this uprigh
is a point equidis-
tant between the
top of the Tilling
tiers (R) and the
top of the
r2 inside lace v
tiers (U ) as at V.
This is the
point of short- R
to lay each brick.
Store tool bag and
S,! plumb rule here
SECTION THROUGH A-A
Pig. 44. — Location of the packs while building the interior face and
filling tiers. Pack-on-the-wall method.