Some Engineering Problems Of The Panama Canal In Their Relation To Geology And Topography
Forfatter: Donald F. MacDonald
År: 1915
Forlag: Washington Government printing Office
Sted: Washington
Sider: 88
UDK: 626.1
Published With The Approval Of The Govenor Of The Panama Canal
Søgning i bogen
Den bedste måde at søge i bogen er ved at downloade PDF'en og søge i den.
Derved får du fremhævet ordene visuelt direkte på billedet af siden.
Digitaliseret bog
Bogens tekst er maskinlæst, så der kan være en del fejl og mangler.
________
78
____ _____________________
ENGINEERING PROBLEMS OF PANAMA CANAL.
BREAKWATERS.
The Naos Island breakwater was charged with rhe difference
between the cost of dumping material on some of the spoil banks
near Balboa and the cost of placing it in the breakwater, including
the charge for tracks, trestles, etc. During the fiscal year 1913,
653,137 cubic yards of material was placed in the breakwater, at
an average cost of $0.2934 per cubic yard.
During the fiscal year ended June 30, 1912, 460,040 cubic yards of
hearting rock from Toro Point was placed in the Colon breakwater,
at an average division cost of $1.3832 per cubic yard, including, of
course, cost of quarrying, loading, transportation, and tracks and
trestle out onto the breakwater.
In addition to the soft heart material, hard coarse rock had to be
used to face or annor the breakwater. This was procured at the Porto
Bello quarry, a detailed statement of the cost being as follows:
Detailed statement of cost of procuring coarse rock from the Porto Bello quarry for the Colon
breakwater, 1912.
Quantity of rock quarried, cubic yards...................................... 183, 762
Cost per cubic yard:
Stripping.......................................................... $0.4178
............................................................
...........................................................
Drilling..............................................................1087
Blasting..............................................................2259
Loading..............................................................________________1278
Transportation.........................................................1427
Tracks............................................................. . 3662
Loading on barges......................................................1956
Power....................................................................................................1257
Maintenance of equipment..............................................6287
Plant, arbitrary........................................................3203
Total per cubic yard................................................ 2. 6594
Cost of towing, per cubic yard :
Operation of tugs and barges............................................2829
Maintenance of equipment..............................................1780
Plant, arbitrary.........................................................3916
Total...................................................................8525
________
Cost of placing material, per cubic yard:
Operation of floating derricks..........................................1716
Maintenance of floating derricks........................................0932
Operation of cranes...................................................1562
Operation of trains....................................................0741
Dumping............................................................0143
Maintenance of equipment............................................1453
Plant, arbitrary.......................................................1553
Total ...............................................................
.8100