Some Engineering Problems Of The Panama Canal In Their Relation To Geology And Topography
Forfatter: Donald F. MacDonald
År: 1915
Forlag: Washington Government printing Office
Sted: Washington
Sider: 88
UDK: 626.1
Published With The Approval Of The Govenor Of The Panama Canal
Søgning i bogen
Den bedste måde at søge i bogen er ved at downloade PDF'en og søge i den.
Derved får du fremhævet ordene visuelt direkte på billedet af siden.
Digitaliseret bog
Bogens tekst er maskinlæst, så der kan være en del fejl og mangler.
______________________________ _____________
______
___________________ _______
COST OF CONSTRUCTION.
CO
Cost of trestles, per cubic yard.............................................. §0.1753
Cost of tug service, miscellaneous, per cubic yard...............................0840
Cost of maintenance of equipment, miscellaneous, per cubic yard...............0393
Division expense, per cubic yard................................................2045
_______
Total division cost, per cubic yard................................. 4. 8250
Administrative and general expenses, per cubic yard..........................4056
Total cost, large rock, per cubic yard.................................
5.2306
SAND.
A comparative statement of the cost of sand on the Atlantic and
on the Pacific sides follows:
Cost of sand for the canal during the fiscal years 1911 and 1912.
Item. Atlantic Division, Nombre de Dios. Pacific Division, Chame.
1912 1911 1912 1911
Quantity of sand obtained: 1 29,539
Cost................
1 SO. 7975
By dredging, cubic yards Cost of operation of dredges Cost of maintenance and equipment Total
144,123 1 412,380 564,837 494,841
SO. 1913 . 1309 SO.2444 . 1010 80.0905 .0403 SO. 0926 .0354
.3222 .3454 .1308 .1280
Total production, cubic yards Operating cost, per cubic yard Cost of plant, arbitrary, per cubic yard Division expense, per cubic yard Total cast of production, per cubic yard Cost of towing, per cubic yard. Operation of tugs and barges Maintenance of equipment Plant, arbitrary
144,123 . 441,919 554,837 494,841
$0.3222 .7890 .0096 SO. 3756 .4740 .0299 SO. 1308 .0202 .0137 SO. 1280 .0300 .0208
1.1208 .8795 .1647 .1788
.2235 .1311 .2820 .2084 .1130 .2209 .0936 .0493 .0309 .1067 . 0553 .0649
Total
.6366 .5423 .1738 .2269
Cost of unloading, per cubic yard: Operation of cableways and cranes Power
.1027 .0189 .0712 .2170 .1189 .0188 .0782 .1496 .0646 .0196 .0335 .0545 .0532 . 0284 .0599 .1067
Maintenance of equipment Plant, arbitrary
Total
.4098 .3655 .1722 .2482
Rail transportation to storage: Quantity transported, cubic yards Cost of operation of trains
60,494 157,967 564,837 475,422
80.0993 .0096 SO. 0982 .0163 .0002 .0787 SO.0403 .0369 .0120 .0241 .0785 $0.0462 .0197 * .0134 .0174 .0849
Cost of dumping storage
Cost of maintenance of equipment Cost of plant, arbitrary .0677
Total
.1766 .1934 .1918 .1816
Total cost of storage i 2.2414 J 1.8565 .7025 .8284