ForsideBøgerSome Engineering Problems… Geology And Topography

Some Engineering Problems Of The Panama Canal In Their Relation To Geology And Topography

Forfatter: Donald F. MacDonald

År: 1915

Forlag: Washington Government printing Office

Sted: Washington

Sider: 88

UDK: 626.1

Published With The Approval Of The Govenor Of The Panama Canal

Søgning i bogen

Den bedste måde at søge i bogen er ved at downloade PDF'en og søge i den.

Derved får du fremhævet ordene visuelt direkte på billedet af siden.

Download PDF

Digitaliseret bog

Bogens tekst er maskinlæst, så der kan være en del fejl og mangler.

Side af 144 Forrige Næste
80 ENGINEEBING PROBLEMS OF PANAMA CANAL. MASONRY. The costs of masonry for tho canal up to Juno 30, 1912, was as follows : Cost of masonry for the canal up to June 30, 1912.a Item. Atlanti Divisio Gatun Locks. c Pacifk n Divisio ’ Pedro Miguel Locks. n Pacific ’ Division, Mira florer; Locks. Concrete, cubic yards . 376,41’ — — 134,19; 729,096 Cost per cubic yard of— Cement $1.5332 SI. 6564 $1 7920 1.9946 .761S 74fi4 Mixing 1.0128 .3823 3564 .1798 .3562 .2258 Total cost per cubic yard 4.7204 3.1568 3.1206 Large rock, cubic yards — Cost per cubic yard ..... SI. 3283 Masonry, cubic yards — - 390,611 134,193 729, 096 Cost per cubic yard of— = Concrete $4. 5478 Largo rock S3.1568 $3.1206 Wood lorms .0483 . 7596 Steel forms . 5077 . 4030 Placing . 1502 .0041 .0364 Reinforcements.... ‘ ’ .4788 .5619 .2014 Pumps Power .0173 .0878 .0074 .0331 .0012 .0327 Cofferdams .0834 .0199 .0289 Maintenance of equipment Plant, arbitrary .2109 .1511 .1545 Division expense ’ ’'. " .8980 . 1015 . 9101 .1143 .5420 .0660 1 otal division cost per cubic yard 7.1317 .2643 5.7183 . 3085 Administrative and general expenditures per cubic yard 4.5867 .2240 Total cost per cubic yard 7.3960 6.0268 4.8107 Masonry, reinforced, cubic yards —- ~ 59,883 48,677 22,444 $2.0051 Cost per cubic yard of— * Cement..'» $2.2111 $2. 2715 1.9930 . 7133 . 7222 Mixing 1. 0381 .3282 .3236 .5855 .4112 .8380 Steel forms 2.8307 1.6959 2.2615 . 1281 . . 7138 Placing Reinforcements .0324 .0085 .0080 .7385 .7087 .8X83 Pumps Maintenance of equipment Plant, arbitrary Division expense '. ” . 8623 1.3263 I. 7997 .0014 .2033 .0197 .1198 .1257 .0931 .9281 . 692.3 . <5487 . 2703 .2241 .3111 . T.otal division cost per cubic yard Administrative and general expenditures per cubic yard 11.8228 .8367 8.5195 . 6443 10.6388 .8172 Total cost per cubic yard 12.6595 9.1638 11.4560 Total masonry, cubic yards total cost per cubic yard 450,494 18.0956 182,870 86. 8618 J 751,540 85.0091 — ■ per cSbk y^-dZ °f spi,lway at Gatun is not covered in table. Its total cost averaged 87.5173