The Mechanical Handling and Storing of Material

Forfatter: A.-M.Inst.C E., George Frederick Zimmer

År: 1916

Forlag: Crosby Lockwood and Son

Sted: London

Sider: 752

UDK: 621.87 Zim, 621.86 Zim

Being a Treatise on the Handling and Storing of Material such as Grain, Coal, Ore, Timber, Etc., by Automatic or Semi-Automatic Machinery, together with the Various Accessories used in the Manipulation of such Plant

Søgning i bogen

Den bedste måde at søge i bogen er ved at downloade PDF'en og søge i den.

Derved får du fremhævet ordene visuelt direkte på billedet af siden.

Download PDF

Digitaliseret bog

Bogens tekst er maskinlæst, så der kan være en del fejl og mangler.

Side af 852 Forrige Næste
ROPE WA YS 299 Colonel S. A. Sadler, proprietor of the Malton Colliery, entrusted the erection of this ropeway to Mr R. E. Commans, the English representative of Messrs Pohlig. It is one of the longest ropeways in this country, having a total length of 3,520 yds. The very fine delivery station of a ropeway for ore in Northern Chile is shown in Fig. 443. Ropeways by J. M. Henderson & Co. An interesting installation, built by J. M. Henderson & Co., of Aberdeen, on the -single rope system, was erected in Tasmania a number of years ago. The lopeway is 3,432 ft. long between the terminals, and is used by the North Mount Lyell Copper ■Co., Ltd., Gormanstown, Tasmania, for conveying copper ore. I he capacity is 60 tons