ForsideBøgerA Treatise On The Princip…ice Of Dock Engineering

A Treatise On The Principles And Practice Of Dock Engineering

Forfatter: Brysson Cunningham

År: 1904

Forlag: Charles Griffin & Company

Sted: London

Sider: 784

UDK: Vandbygningssamlingen 340.18

With 34 Folding-Plates and 468 Illustrations in the Text

Søgning i bogen

Den bedste måde at søge i bogen er ved at downloade PDF'en og søge i den.

Derved får du fremhævet ordene visuelt direkte på billedet af siden.

Download PDF

Digitaliseret bog

Bogens tekst er maskinlæst, så der kan være en del fejl og mangler.

Side af 784 Forrige Næste
244 DOCK ENGINEERING. intended, but in view of the increase in depth continually demanded by modern shipping, a concrete floor to a basin is a feature which cannot be considered free from inconveniences. No deepening of the basin is possible without its removal, which must prove a costly and troublesome under- taking. Sluicing is carried on daily at the Canada Basin, but the maximum effect is obtained at low water of spring tides, a time when the basin is very shallow, and when the inner docks can afford to part with a considér- able amount of the water impounded on the flood tide. The water in the docks is always levelled with the incoming tide two hours before high water, within which period the operations of docking and undocking are carried on. ENLARGED SECTION THROUGH OUTLET. i n. Soa^, IZ Feet^lTnohj. ^^f 1 lyt f________y________'i5 ___^ 'F^H. Fig. 174. Sluicing on a large scale is a prominent feature of ports bordering on the English Channel. The method usually adopted is that of impounding a quantity of water during the flood tide, in a basin specially constructed for the purpose. At high water the sluice gates of this basin are closed, and the contents retained until a suitable period about low water, when the gates are opened again. The discharge of a large volume of water is found to be absolutely essential to the maintenance of entrance channels so subject to the introduction of sand by a littoral current, with its attendant deposition. The rate of discharge provided at Dunkirk and Calais is about 500 cubic yards per second, and the effective duration about three-quarters of an hour. The recent improvement works at the port of Ostend (fig. 175) com- prise a considerable enlargement of area in the sluicing enclosure there, concerning which M. Van der Schueren * makes the following obser- vations :— “ Ships drawing much water will be able to enter the port by favour of * Van der Schueren on “Travaux exécutés récemment et en cours d’exécution au port d’Ostende,” Int. Nav. Cong., Paris, 1900.