A Treatise On The Principles And Practice Of Dock Engineering
Forfatter: Brysson Cunningham
År: 1904
Forlag: Charles Griffin & Company
Sted: London
Sider: 784
UDK: Vandbygningssamlingen 340.18
With 34 Folding-Plates and 468 Illustrations in the Text
Søgning i bogen
Den bedste måde at søge i bogen er ved at downloade PDF'en og søge i den.
Derved får du fremhævet ordene visuelt direkte på billedet af siden.
Digitaliseret bog
Bogens tekst er maskinlæst, så der kan være en del fejl og mangler.
32
DOCK ENGINEERING.
TABLE III. (Coniwued). —Liverpool Docks.
Liverpool Docks. Position and Width of Entrance or Passage. Sill below Datum. Doping at Hollow Quoins above Datum. Watei Area. Lineal Quayage.
Clarence Graving Dock Basin, | ,, Half-Tide Dock, ,, Dock, Trafalgar Lock, „ Dock, Victoria Dock, West Waterloo Dock, East „ >> • • Prince’s Half-Tide Dock, „ Lock, 110 ft. long, . ’, Dock, *George’s Dock Passage, Manchester Dock, . ,, Lock, 86 ft. long, *Canning Dock, * ,, Half-Tide Dock, *Albert Dock, . • | *Salthouse Dock, . *Wapping Basin, . . I Diike’s Dock, • ■ • { *Wapping Dock, *King’s Dock, Queen’s Half-Tide Dock, * ,, Dock, ,, Branch Dock, No. 1, . *Coburg Dock, *Brunswick Dock, . ,, Half-Tide Dock, . *Union Dock, ■ • • { Toxteth Dock, ,, Lock, 177 ft. long, . Harrington Dock, . Lock, 131 ft. long, Herculaneum Dock, Branch Dock, . Ft. In. Nortli . 45 0 South . 44 6 West . 50 0 ,. . 47 0 North. 45 0 ,, ■ 44 3 South . 50 0 ,, . 60 0 „ . 60 0 ö (North 65 0 $JMid. 32 0 ISouth 65 0 North. 45 0 South. 40 3 West . 32 10 „ • 33 8 » . 45 0 « (North 45 0 (South 45 0 North. 45 0 East . 45 0 North . 45 0 ,, . 50 0 South . 50 0 West . 40 0 „ . 40 0 Middle 40 0 South . 50 0 East . 50 0 South . 100 0 West . 70 0 North . 100 0 West . 45 0 North. 60 0 South . 60 0 » . 60 0 West . 50 0 South . 60 0 West . 22 0 « f North 80 0 £ (South 60 0 Ft. In. 4 9 4 6 5 0 3 2 6 7 6 7 6 6 8 0 8 0 8 0 8 0 8 0 5 11 4 6 Above 0 3 Below 3 9 6 1 6 3 6 3 6 4 6 0 6 0 5 8 6 0 5 8 4 2 4 7 6 0 6 0 17" 6 5" 7 17 6 6 0 6 6 12 0 12 0 8 0 12 0 5 9 12 0 12 0 Ft. In. 26 01 26 6/ 26 8 26 0 23 10 21 11 26 0 22 1 22 1 31 01 31 0 - 31 0) 27 5 24 5 23 3 24 3 26 2 28 31 28 3) 26 01 26 OJ 26 0 26 01 26 0 - 25 o j 25 10( 22 9J 26 0 26 0 29 5 30 6 29 0 26 6 27 01 31 0/ 31 0 31 0 31 0 31 0 31 01 31 OJ Acres. Yards. 1 1056 4 1794 6 273 0 2937 6 459 5 4374 3 2146 2 3375 4 3250 11 1490 0 1033 1 595 0 315 4 376 2 2688 7 3542 6 2019 1 3151 2 1336 5 499 7 3896 3 3542 10 3124 4 4384 7 3157 12 3533 1 1399 1 1941 11 1075 0 1013 9 256 0 320 7 2581 2 853 Miles. Yards. 0 291 0 635 0 914 0 256 0 724 0 701 0 533 0 506 0 4.34 0 1194 0 152 0 339 0 57 0 585 0 429 0 885 0 784 0 454 0 1138 0 815 0 875 0 445 0 1114 0 654 0 939 0 1070 0 250 0 361 0 1134 0 118 0 1023 0 596 0 577
Total Water Area and Lineal Quayage of the Liverpool Docks, 389 3751 24 1542
* The water in the group of Docks from Canning to Brunswick Docks, inclusive, is
impounded over low neap tides, and any loss made good by P"1^1“« £r°”
By these means the effective depth of these docks is made not less than that
lowest Sills over which they can be approached-viz., 12 feet below datu .