ForsideBøgerRapport Over Skibsbyggeriet I England 1865-66

Rapport Over Skibsbyggeriet I England 1865-66

Forfatter: A. B. Münter

År: 1866

Forlag: C. Ferslew & Co.

Sted: Kjøbenhavn

Sider: 80

UDK: 629.120

Søgning i bogen

Den bedste måde at søge i bogen er ved at downloade PDF'en og søge i den.

Derved får du fremhævet ordene visuelt direkte på billedet af siden.

Download PDF

Digitaliseret bog

Bogens tekst er maskinlæst, så der kan være en del fejl og mangler.

Side af 108 Forrige Næste
 Remarks. tached by an Angle Ir. 3'11“ X 3'11“ X9/16" one on each side; a T iron forms the. edge strip in the jump jointed ,Bulkheads 41/2" X 23/8" X 1/2", the stiffeners to these are 4‘ 6" apart and of 31/2" X 31/2" X 3/16" Angle Ir. Single rivetted. Where they connect the pla- |tes only. Double Angle Irons. Do Edge Strips to outer thick- |ness only. The pitch of the rivets de- jpends on the position of the armour bolts, if no holt passes through then they are rivetted thus and they extend |from frame to frame, [single Angle Irons. do. do. Treble Rivetted. One Deck and one plate fa- stening alternately. Single rivetted. Double butt straps, treble rivetted. One Deck fastening and one plate fastening alternately. Fortsat. Breadth of La Thickness of Iron. 7/16" to 1/2" Pl. 1/2" Pl. 3/1644 Angle Iron 7" 5’4" 5" 121/9" 41/8" 10" 35," 10" »Bellerophon« fortsat Description of Work. Edge Strips to jump jointed Bulkheads. Butt Straps to do. Stiffeners to do. 5/s" Angle ir. to 7/s" Pl. 5/s" Angle Ir. to two 3/4 Pl. 2 thicknesses of 3/44 Pl. 5/s" Angle Ir. to ‘/a" Fr. 11/2" Pl. to 5/8" Fr. a/" Pl. 1/2" Pl. 3/4" Pl. Recess Angle Iron to recess plate. Recess Angle Iron to plating behind Arm.| Iron Backing behind Armour Plate. Angle Irons to the Frames. Plating to the Frames. Edge Strips to the Plating, do. do. Butt straps to do. both inner and outer thicknesses. |1/2" Pl to 9/164 Angle Ir.| |9/ic" Angle Ir. to 'h“ Pl. ! 1/2" Pl. to 'h“ Pl. 'll“ Pl. 1/2" Pl. 1/2" Steel Pi. 1" Steel Pl. 1/2" do. I" do. 14 do. 'If“ do. Topside Frames. Angle Irons to topside Frames. Brackets to do. Edge Strips to do. Butt Straps to do. Upper Deck Plating. do. Edge Strips to 1/2 " do. Butt Straps to do. do. > Edge Strips to 1/4 " do. Butt Straps to do. do.